1983 National Construction Company Pakistan Steel Mill Karachi Erection of Electrical Substation
1984 Descon Engineering (Pvt) Ltd. National Refinery Karachi Erection of Aire Pipe & Instrumentation
1986 SECO Pakistan State Oil Karachi Fabrication & erection of oil pipe line maintenance of pumping station
1988-89 SECO Karachi National Fiber Auto Control System
1990-01 SECO Lahore & Karachi Airport Construction of substation laying & erection of D.V.O.R. steel structure & fancing.
1992 Descon Engineering (Pvt) Ltd. LMW Workshop Lahore Fabrication of steel structure for A.C. WAH cement
1993 A.C. WAH Cement WAH Erection of electrostatic precipitator
1994-95 Descon Engineering (Pvt) Ltd. LMW Workshop Lahore Fabrication of steel structure & equpment for Lucky Cement & Fauji Cement
1995-96 Lucky Cement Lucky Marwat Fabrication, Painting, Erection of Ducts & Steel Structure
1996 Mectec Pak American Fertilizer Iskandarabad Fabrication of Urea Bulk storage steel structure
1997 Descon Engineering (Pvt) Ltd. LMW 412 MW Rousch Power Plant Abdul Hakeem

Fabrication of pipe rack steel structure & inlet, outlet duct of boilers

1997 Descon Engineering (Pvt) Ltd. 412 MW Rousch Power Plant Abdul Hakeem a) Erection of steel structure of boiler & pipe rack.
b) Erection of cladding & insulation of boiler
c) Painting of steel structure, boiler & pipe rack
1998-2000 PARCO Oil Refinery Muzaffargarh

a) Fabrication of steel structure
b) Erection of Tanks

1999-2000 Rousch Power Plant 412 MW Rousch Power Plant Abdul hakeem Skilled man power supply for commissioning of heat recovery boilers
2001 OMV Sindh Fabrication & erection of slug catcher & water storage tank
2001 412 MW Rousch Power Plant 412 MW Rousch Power Plant Abdul hakeem Maintenacnce of boiler & shutdown
2002 HMC POL Chak Baili Erection of skid & vessels fabrication & erection of structure & piping
2002 Cherat Cement Cherat Cement Fabrication & Erection of EP
2003 412 MW Rousch Power Plant 412 MW Rousch Power Plant Abdul hakeem Replacement of boiler tubes